First Tesla Semi rolls off high-volume line in Sparks, Nevada
Tesla showed the first Semi from its new high-volume line at Gigafactory Nevada on April 29, 2026, saying volume production was now underway. The dedicated 1.7 million square foot plant is designed for 50,000 trucks a year, with a gradual ramp.
- First truck off the high-volume line, Gigafactory Nevada, April 29, 2026
- Plant designed for 50,000 trucks per year
- Tesla says volume production is now underway, with a gradual ramp
TSLA around the story · hourly24 h reaction ▲ 1.48%
Source
ElectrekApr 29, 2026